九九热这里只有精品_国产综合视频在线无码_新国产成人综合久久_熟年夫妇の密着浓厚交尾

全國服務熱線:

15853163650
您當前的位置:首頁 > 新聞動態(tài) > 公司動態(tài)
    聯(lián)系我們

    CONTACTS US

    濟南皓暉建材有限公司,總部位于中國泉城——山東濟南,是一家專業(yè)生產銷售石塑電梯門套,仿大理石電梯門套的專業(yè)廠家。皓暉建材在電梯門套生產行業(yè)很多年,憑著優(yōu)質的產品質量和完善的售后服務,在全國各地都有我們的工程案例。

    我們本著“以質量求生存 ,靠管理出效益,憑信譽贏口碑,以實干筑輝煌”的經(jīng)營理念,公司將立足于當代建材現(xiàn)代化發(fā)展前沿,依靠科技、勇于探索,以優(yōu)質產品優(yōu)良服務、信譽與廣大用戶攜手共創(chuàng)輝煌。

    聯(lián)系電話: 15853163650

    工廠地址:山東濟南章丘區(qū)(歡迎廣大客戶來廠勘察)

公司動態(tài)

COMPANY NEWS

電梯套門窗套安裝步驟及參數(shù)

2016-05-30 14:10:02 文章來源:www.75w5.com

1、施工流程 :檢查安裝墻面、套口——定位與放線——檢查石塑線條和搭配側板——結構膠涂點——安裝固定——清潔飾面
1, the construction process: check the installation wall, set mouth, positioning and Ray - stone check plastic lines and side plate structure glue Tu point collocation, fixed installation, clean finish
2、檢查安裝墻面、套口:檢查墻面和套口的安裝前提是否具備,檢查門套預留洞口尺寸是否符合設計要求,窗套檢查預留臺面是否符合尺寸。
2, check the mounting surfaces, set mouth: check the wall and the mouth of the installation premises have and check door reserved hole size is consistent with the design requirements, Chuangtao check reservation table are in accordance with the dimensions.
3、定位放線:根據(jù)設計要求,在實際位置做出基礎線,并保證整體方正。門套定位,壓框寬度應保證余量尺寸一致。
3, positioning line: according to the design requirements, in the actual position to make the basic line, and to ensure that the overall founder. Door positioning, pressing frame should ensure the uniform size of margin width.
4、檢驗石塑線條和側板:安裝前,檢查石塑線條和側板的尺寸、規(guī)格、加工質量、特備零件的規(guī)格以及數(shù)量必須符合設計及規(guī)范要求。

電梯門套
4, test stone plastic lines and side plate: before installation, check stone plastic lines and side plate dimensions, specifications, processing quality, special parts of the specifications and quantity must comply with the design requirements and specifications.
5、結構膠涂點:在電梯套和門窗套所需的石塑線條和側板背部進行結構膠均勻打點,間距為10-20CM為宜。
5, the structure of glue Tu point: required in the elevator and sets of doors and windows of stone plastic lines and side plate back structure glue evenly RBI, spacing 10-20CM is appropriate.
6、安裝固定:電梯套和門套安裝需對安裝部位首先量尺,處理接頭及轉角位置;設計無特殊要求,接頭應成45°角;然后直接按照施工圖要求進行上墻安裝。
6, fixed installation: set of elevator and door installation required on the installation location, scale, joints and corner position processing; design has no special requirements, the joints should be into a 45 degree angle, then directly in accordance with the construction requirements for wall mounting.
7、清潔飾面:安裝完工之后撕去飾面的保護膜,用抹布和肥皂水對勾縫出進行清潔處理。
7, clean finish: protective film installation after completion of tear finishes, pointing out to clean with a rag and soapy water.
本文由電梯門套提供幫助,更多的相關內容請點擊:http://www.75w5.com我們將詳情為您解答.歡迎您的光臨!
The elevator door to provide help, more relevant content please click: http://www.75w5.com us the details for you to answer. Welcome your presence!