九九热这里只有精品_国产综合视频在线无码_新国产成人综合久久_熟年夫妇の密着浓厚交尾

全國(guó)服務(wù)熱線:

15853163650
您當(dāng)前的位置:首頁(yè) > 新聞動(dòng)態(tài) > 行業(yè)新聞
    聯(lián)系我們

    CONTACTS US

    濟(jì)南皓暉建材有限公司,總部位于中國(guó)泉城——山東濟(jì)南,是一家專業(yè)生產(chǎn)銷(xiāo)售石塑電梯門(mén)套,仿大理石電梯門(mén)套的專業(yè)廠家。皓暉建材在電梯門(mén)套生產(chǎn)行業(yè)很多年,憑著優(yōu)質(zhì)的產(chǎn)品質(zhì)量和完善的售后服務(wù),在全國(guó)各地都有我們的工程案例。

    我們本著“以質(zhì)量求生存 ,靠管理出效益,憑信譽(yù)贏口碑,以實(shí)干筑輝煌”的經(jīng)營(yíng)理念,公司將立足于當(dāng)代建材現(xiàn)代化發(fā)展前沿,依靠科技、勇于探索,以優(yōu)質(zhì)產(chǎn)品優(yōu)良服務(wù)、信譽(yù)與廣大用戶攜手共創(chuàng)輝煌。

    聯(lián)系電話: 15853163650

    工廠地址:山東濟(jì)南章丘區(qū)(歡迎廣大客戶來(lái)廠勘察)

行業(yè)新聞

COMPANY NEWS

仿大理石uv板的鋪裝方法

2016-10-26 13:36:54 文章來(lái)源:www.75w5.com

  室內(nèi)墻面往往采用仿大理石UV板進(jìn)行鋪裝,室外也會(huì)用到,外墻仿大理石UV板不僅具有出色的裝飾效果更能保護(hù)墻面,一些寫(xiě)字樓和酒店通常外墻都會(huì)選用仿大理石來(lái)進(jìn)行鋪裝,不僅裝飾效果大氣,更大大提升了整體的奢華程度和檔次感。墻面在鋪裝仿大理石UV板的時(shí)候需要先在墻面打上基層,然后在鋪裝,保證了裝飾墻面的裝飾性和牢固性。
The interior walls are often used in UV imitation marble pavement, the outdoor wall will be used, UV imitation marble plate has excellent decorative effect to protect the wall, some office buildings and hotels usually will choose to external wall imitation marble pavement, not only decorative effect, greatly enhance the overall level of luxury and grade sense. Wall in the pavement imitation marble UV board need to be first in the basic level, and then in the pavement, to ensure that the decorative wall decoration and firmness.
一、仿大理石UV裝飾板材和輔料的準(zhǔn)備:
A, imitation marble UV decorative plate and accessories preparation:
1、在選用仿大理石UV裝飾板材的時(shí)候,厚度在6MM左右,整體花色要盡量協(xié)調(diào),需要拼接的板材,提前裁剪好尺寸,保證施工時(shí)花紋能夠完美拼接。
1, in the selection of imitation marble UV decorative plate, the thickness of 6MM or so, the overall design and color to be as far as possible to coordinate, the need to splice the plate, cut in advance the size, to ensure that the construction pattern can be perfect stitching.
2、安裝輔料的準(zhǔn)備:仿大理石UV板安裝的時(shí)候需要用到板材專用膠、結(jié)構(gòu)膠、砂紙、發(fā)泡膠,如果有分縫線條的話還需要用到氣釘槍,省去了傳統(tǒng)的水泥和干掛件。
2, installation accessories preparation: imitation marble UV board mounting plate when the need to use special adhesive, structural adhesive, sandpaper, styrofoam, if there is a parting line you need to use the pneumatic nail gun, eliminating the traditional cement and dry hanging.
二、墻面基層龍骨施工步驟:
Two, the construction procedure of the wall base keel:
1、檢查洞口及埋件;
1, check the hole and buried pieces;
2、檢查門(mén)窗洞口是否方正垂直,預(yù)埋木磚或連接鐵件是否符合要求;
2, check whether the doors and windows are vertical, embedded block or connection iron meets the requirements;
3、墻面彈線;
3, wall line;
4、仿大理石UV板應(yīng)根據(jù)設(shè)計(jì)要求事先彈出安裝高度的水平線;
4, imitation marble UV board should be in accordance with the design requirements of the installation of a high level of pre installed horizontal line;
5、制作及安裝木龍骨;
5, the production and installation of wooden keel;
6、全高仿大理石UV板根據(jù)房間四角和上下龍骨先找平、找直,按面板分塊大小由上到下做好木標(biāo)筋,然后在空檔內(nèi)根據(jù)設(shè)計(jì)要求釘橫豎龍骨;
6, the high imitation marble UV plate according to the four corner of the room and on the keel first leveling, straight, according to the panel block size from top to bottom to standard wooden bars, and then according to the design requirements in neutral in the nail keel anyway;
7、木護(hù)墻龍骨間距,當(dāng)設(shè)計(jì)無(wú)要求時(shí),一般橫龍骨間距為300MM,豎龍骨間距為400MM。
7, wooden wall keel spacing, when no design requirements, generally horizontal keel spacing is 300MM, vertical keel spacing is 400MM.
8、安裝木龍骨必須找方找直,除預(yù)留出板面厚度外,骨架與木磚間的空隙應(yīng)墊以木墊,用釘子釘牢,每塊木磚至少釘兩個(gè)釘子。
8, the installation of wooden keel must find square look straight, in addition to set aside a plate thickness, the gap between the pad and wooden skeleton with wood pad, nail, each at least two nails nail nog.
您的滿意,是我們的追求,讓我們攜手共創(chuàng)二十一世紀(jì)美好明天!我們公司將一如既往的珍視客戶的厚愛(ài)和信任,永遠(yuǎn)追求完美服務(wù)品質(zhì),書(shū)寫(xiě)讓客戶滿意的答卷。
Your satisfaction is our pursuit, let us join hands in creating a better tomorrow in twenty-first Century! Our company will be as in the past cherished customers love and trust, the pursuit of perfect quality of service forever, let customer satisfaction report writing.