新聞中心
NEWS CENTER
聯(lián)系我們
CONTACTS US
濟(jì)南皓暉建材有限公司,總部位于中國(guó)泉城——山東濟(jì)南,是一家專業(yè)生產(chǎn)銷售石塑電梯門套,仿大理石電梯門套的專業(yè)廠家。皓暉建材在電梯門套生產(chǎn)行業(yè)很多年,憑著優(yōu)質(zhì)的產(chǎn)品質(zhì)量和完善的售后服務(wù),在全國(guó)各地都有我們的工程案例。
我們本著“以質(zhì)量求生存 ,靠管理出效益,憑信譽(yù)贏口碑,以實(shí)干筑輝煌”的經(jīng)營(yíng)理念,公司將立足于當(dāng)代建材現(xiàn)代化發(fā)展前沿,依靠科技、勇于探索,以優(yōu)質(zhì)產(chǎn)品優(yōu)良服務(wù)、信譽(yù)與廣大用戶攜手共創(chuàng)輝煌。
聯(lián)系電話: 15853163650
工廠地址:山東濟(jì)南章丘區(qū)(歡迎廣大客戶來(lái)廠勘察)
行業(yè)新聞
COMPANY NEWS
仿大理石uv板的安裝順序
2018-05-04 09:42:18 文章來(lái)源:www.75w5.com
仿大理石uv板安裝記住這四個(gè)順序:先頂后墻,先板后線,自下而上,從外往里。
Like marble UV board installation, remember these four orders: first, the top and back walls, the first plate and the back line, from bottom to top, from outside to inside.
頂后墻是指先安裝吊頂再安裝墻板。安裝吊頂時(shí)需要先固定好龍骨;在墻板安裝第一塊仿大理石uv板需先用鋼釘固定在墻板上,以后每安裝一塊一邊扣在前一塊仿大理石uv板上,另一邊用在打釘邊上固定。安裝時(shí)要注意整體的畫面設(shè)計(jì),需先分格彈線,根據(jù)預(yù)先設(shè)計(jì)好的圖紙安裝。如遇到插座位置,需要預(yù)先留好插座口。
The top wall is the first installation of the ceiling and then the wall plate. When installing the ceiling, we need to fix the keel first; the first piece of marble UV board in the wall board should be fixed on the wall plate first with the steel nail, and then one piece is fastened on the front of the previous imitation marble UV board, and the other is fixed on the side of the nail. When installing, attention should be paid to the overall picture design, which needs to be divided into lattice shells and installed according to the pre designed drawings. If there is a socket outlet, you need to reserve a socket outlet in advance.
先板后線是指先安裝主要的板材,再安裝線條,先大面積安裝,再處理轉(zhuǎn)角、收邊等細(xì)節(jié)。如果遇到立柱,可采用背面開槽的方法將立柱包住。
The first line is to install the main plate first, then install the line, then install it in a large area, then handle the details such as corner and edge. If a column is encountered, the column can be wrapped by the method of slotting on the back.
自下而上是指安裝墻板時(shí),需要先從墻底開始安裝,逐漸往上增加,直到安裝完整個(gè)墻板。
From bottom to top, when installing wall panels, it is necessary to install them from the bottom of the wall first, and then increase gradually until the complete wall panels are installed.
從外往里是指從房間進(jìn)門的墻板開始往里的順序安裝,這是因?yàn)榘惭b到最后部分需要切割,從外往里安裝更加的美觀。
From the outside, the wall board from the room starts to start in the order of the inside, this is because the final part of the installation needs to be cut, from the outside to install more beautiful.
整體上來(lái)說(shuō),集成墻頂安裝非常便捷,直接安裝在毛坯墻板,兩個(gè)木工師傅即可完成。如果墻板不平,則需要在安裝前找平墻板。
On the whole, the installation of the integrated wall top is very convenient, it is directly installed on the blank wall panels, and two woodworking masters can complete. If the wall is uneven, the wall panel must be leveled before installation.