九九热这里只有精品_国产综合视频在线无码_新国产成人综合久久_熟年夫妇の密着浓厚交尾

全國服務(wù)熱線:

15853163650
您當(dāng)前的位置:首頁 > 新聞動(dòng)態(tài) > 行業(yè)新聞
    聯(lián)系我們

    CONTACTS US

    濟(jì)南皓暉建材有限公司,總部位于中國泉城——山東濟(jì)南,是一家專業(yè)生產(chǎn)銷售石塑電梯門套,仿大理石電梯門套的專業(yè)廠家。皓暉建材在電梯門套生產(chǎn)行業(yè)很多年,憑著優(yōu)質(zhì)的產(chǎn)品質(zhì)量和完善的售后服務(wù),在全國各地都有我們的工程案例。

    我們本著“以質(zhì)量求生存 ,靠管理出效益,憑信譽(yù)贏口碑,以實(shí)干筑輝煌”的經(jīng)營理念,公司將立足于當(dāng)代建材現(xiàn)代化發(fā)展前沿,依靠科技、勇于探索,以優(yōu)質(zhì)產(chǎn)品優(yōu)良服務(wù)、信譽(yù)與廣大用戶攜手共創(chuàng)輝煌。

    聯(lián)系電話: 15853163650

    工廠地址:山東濟(jì)南章丘區(qū)(歡迎廣大客戶來廠勘察)

行業(yè)新聞

COMPANY NEWS

KTV設(shè)計(jì)裝修驗(yàn)收標(biāo)準(zhǔn)有哪些?

2016-04-08 13:47:43 文章來源:www.75w5.com

1、KTV裝修排風(fēng)系統(tǒng)驗(yàn)收
1, KTV decoration exhaust system acceptance
KTV是娛樂空間,對(duì)于排風(fēng)、排煙系統(tǒng)要求很嚴(yán)格,排風(fēng)的性能必須非常出眾。驗(yàn)收方法:點(diǎn)一根煙放在KTV包廂的底下,要與排風(fēng)通道保持一定距離,測(cè)試能不能把煙的味道吸進(jìn)去,然后仔細(xì)的聽一聽雜音不要太大即可。
KTV is the entertainment space, for exhaust, exhaust system requirements are very strict, exhaust performance must be very outstanding. Acceptance method: point a cigarette on the bottom of the KTV box, to maintain a certain distance with the exhaust channel, the test can not smoke into the taste, and then carefully listen to the noise not too large.
2、KTV裝修背景燈驗(yàn)收
2, KTV decoration background light acceptance
背景燈在KTV裝修中運(yùn)用的很廣泛,很多背景燈都是用7彩燈管內(nèi)接而成的,外面放置不同樣式的面板,在切換顏色間營造出迷幻的KTV空間氣氛。
Background light in the KTV decoration used very widely, a lot of background light is seven color lamp inscribed, out of place in different style panel, between the switch colors to create psychedelic KTV space atmosphere.
驗(yàn)收方法:在驗(yàn)收的時(shí)候,要檢查觸控是否靈敏,顯示的顏色是否一致,或者同一顏色里是否出現(xiàn)深淺顏色分布不均。

Acceptance method: in the acceptance of the time, to check whether the sensitivity of touch, display the color is consistent, or whether the same color in the color of the uneven distribution.

KTV設(shè)計(jì)裝修

3、KTV裝修頂棚布線驗(yàn)收
3, KTV decoration ceiling wiring acceptance
在KTV裝修完畢之后,頂棚內(nèi)布線的驗(yàn)收非常重要,設(shè)備的接線,水電的線路一個(gè)都不能大意,極小的疏忽都有可能造成十分嚴(yán)重的后果。由于里面的線路多且雜,所以所有的線路都必須穿鐵管,部分管道可用PVC管替代。
Wiring in the ceiling of the acceptance is very important in the KTV decoration after, wiring of the equipment, water and electricity wiring a can not be careless, tiny negligence are likely to have very serious consequences. Because the inside of the line and miscellaneous, so all lines must wear iron pipe, PVC pipe to replace part of the pipeline is available.
4、KTV裝修材料質(zhì)量確定
4, KTV decoration materials quality determination
KTV裝修施工結(jié)束后應(yīng)當(dāng)對(duì)裝修實(shí)用材料的質(zhì)量和數(shù)量進(jìn)行確定,因?yàn)樵谠谘b修的過程中,有許多原因可引發(fā)經(jīng)濟(jì)補(bǔ)償,如主要裝修材料由其它材料代用、材料的數(shù)量發(fā)生變動(dòng)、材料質(zhì)量是否按要求購買等,這些都需要納入工程的結(jié)算中,以便對(duì)費(fèi)用進(jìn)行調(diào)整。
After the end of the KTV decoration construction shall be of practical decoration materials quality and quantity is determined as in the decoration process, there are many reasons can lead to economic compensation, such as the main decoration materials by a number of other alternative materials, materials occur change, quality of material, whether according to beg buy, these need to incorporate engineering settlement, to adjust the cost.
5、KTV裝修預(yù)算書認(rèn)定
5, KTV decoration budget identified
因?yàn)樵谠A(yù)算書的工程造價(jià)中,由于某些原因,如實(shí)際工程量的增減、材料價(jià)格的浮動(dòng)等都會(huì)使原預(yù)算發(fā)生變化,在工程竣工以后,雙方應(yīng)共同商議,在結(jié)算中對(duì)增減項(xiàng)目加以確認(rèn)。
Because in the book of the original budget of the project cost, due to some reasons, such as the actual engineering quantity increase or decrease, the price of materials floating can make the original budget change, after the completion of the project, both sides should take counsel together, in the settlement of project or confirmed.
6、KTV裝修工程質(zhì)量驗(yàn)收
6, KTV decoration engineering quality acceptance
在工程施工過程中,往往會(huì)因?yàn)橐恍┛蛻舢a(chǎn)生新的想法或其它的一些原因引起工程設(shè)計(jì)變更,這必然會(huì)造成施工的變更,增加工作量,由此必然引起費(fèi)用上的變更,所以在結(jié)算中要對(duì)實(shí)際工程量進(jìn)行確認(rèn)。
In the construction process, often because some customers have new idea or some other reasons cause the engineering design change, this will inevitably cause the construction change, increase the workload, which will inevitably lead to cost changes, so in the settlement to to confirm the actual amount of the project.