新聞中心
NEWS CENTER
聯(lián)系我們
CONTACTS US
濟南皓暉建材有限公司,總部位于中國泉城——山東濟南,是一家專業(yè)生產(chǎn)銷售石塑電梯門套,仿大理石電梯門套的專業(yè)廠家。皓暉建材在電梯門套生產(chǎn)行業(yè)很多年,憑著優(yōu)質(zhì)的產(chǎn)品質(zhì)量和完善的售后服務(wù),在全國各地都有我們的工程案例。
我們本著“以質(zhì)量求生存 ,靠管理出效益,憑信譽贏口碑,以實干筑輝煌”的經(jīng)營理念,公司將立足于當(dāng)代建材現(xiàn)代化發(fā)展前沿,依靠科技、勇于探索,以優(yōu)質(zhì)產(chǎn)品優(yōu)良服務(wù)、信譽與廣大用戶攜手共創(chuàng)輝煌。
聯(lián)系電話: 15853163650
工廠地址:山東濟南章丘區(qū)(歡迎廣大客戶來廠勘察)
行業(yè)新聞
COMPANY NEWS
石塑電梯套線條施工流程
2018-05-15 17:27:05 文章來源:www.75w5.com
石塑電梯套線條是一種pvc+天然石粉組成的新型混合原料,這種原料的電梯套不光具有大理石的斑紋與質(zhì)地,更具有杰出的耐性與硬度,可以說是一種性價比極高的原料門套資料。那么,石塑電梯套線條的施工流程是什么呢?
The stone plastic elevator sleeve is a new mixture of pvc+ natural stone powder. The elevator sleeve of this kind of raw material can not only have the markings and texture of marble, but also has excellent resistance and hardness. It can be said to be a kind of material with high cost performance. Then, what is the construction process of stone plastic elevator?
1、物料準(zhǔn)備:線條、側(cè)板、泡棉膠、硅酮膠(或云石膠)、45°切開鋸、臺鋸、膠槍、紅外線儀器;
1, material preparation: lines, side panels, foam glue, silicone rubber (or marble glue), 45 degree cut saw, table saw, glue gun, infrared instrument;
2、布局墻體基面清算清潔外面沒有油污、浮塵、并查驗墻面平整度和筆直度。超差部分應(yīng)剔鑿或用水泥沙漿修補缺陷,加固找平,方能施工;
2. Lay out the base of the wall and clean it up. There is no oil pollution, floating dust, and check the evenness and straightness of the wall. The oversize part should be chipped or repaired with cement mortar to strengthen the leveling before construction.
3、在墻面找出水平線、筆直控制線;
3. Find out the horizontal line and the straight control line on the wall.
4、切開鋸采納45度角對線條切開并對角拼接反省平整度厚板+線條方式:假設(shè)墻面是干掛大理石根基,需要用小木方在墻面上找3-4個點,然后用云石膠點粘,小木方周圍用發(fā)泡膠加添;然后將切好45度切角的線條卡扣在側(cè)板上,線條另一側(cè)點粘到墻面上;薄板+線條方式:
假設(shè)墻面是干掛大理石根基,需要用細木工板打底,然后將薄板用泡棉膠暫時結(jié)實,云石膠點粘到細木工板上;然后將薄板切開部分卡在線條卡槽中 ,將線條設(shè)備到位,壓實,結(jié)實在墻體細木工板基面上??ú垡环矫婵梢哉趽踝?cè)板切開處的瑕疵,另一方面設(shè)備速率可以前進。(分外闡明:泡棉膠起到暫時結(jié)實的感染,硅酮膠24小時內(nèi)無法凝結(jié),但其前期感染力強,所以二者一起使用才干到達預(yù)期結(jié)果)
4, cut saw adopted 45 degrees angle to cut lines and diagonal splicing to reflect the smoothness of thick plate + lines: assuming that the wall is dry and hanging marble foundation, need to use small wood to find 3-4 points on the wall, then use the sticky sticky point of the mica glue, the small wood side with foam glue added around, and then cut the line of 45 degree angle cut on the side board. The other side of the line adheres to the wall.
Assuming that the wall is a dry marble foundation, it needs to be bottled up with a carpenter's board, then the sheet is temporarily sturdy with foam rubber, and the mica glue points to the carpenter board; then the thin plate section is stuck in the line card slot, and the line equipment is in place, compacted and sturdy on the wall carpenter's base surface. On the one hand, the card slot can block the defects on the side board, and on the other hand, the equipment speed can move forward. (expound: foam rubber has a temporary and sturdy infection, and silicone rubber can not condense within 24 hours, but its early infection is strong, so the two use the talent to reach the expected results).
7、將對角處裂縫打硅酮膠填滿抹
7. Fill the corner crack with silicone rubber
8、將線條與墻的空隙打膠抹
8. Glue the gap between the line and the wall
9、側(cè)板根據(jù)現(xiàn)實尺度用臺鋸切開,施工辦法請參照線條(根基平整,泡棉膠暫時結(jié)實,硅酮膠點粘
9. Side panels should be cut by table saws according to the actual scale. The construction methods refer to the lines (the foundation is smooth, the foam glue is temporarily strong, and the silicone glue is sticky.
10、全體竣工
10. Completion of the whole
下一篇:仿大理石uv板是什么?